Water Details
- 6-41 Utility Trench for Water Main rev 08-23
- 6-42 Thrust Block Detail
- 6-43 Valve Box Collar Detail rev 1-22.
- 6-44 Service Conn. & Meter Assembly rev 10-22-Model.
- 6-46 Fire Hydrant Assembly rev 11-15-23
- 6-50 Combination Air Release Valve.
- 6-51 Air Release Valve Manhole Detail.
- 6-52 PRV Vault Plan.
- 6-53 PRV Vault Section.
- 6-54 TYP Backflow Preventer Installation
- 6-55 Buried 2 in Blow-Off Installation rev 1-22.
- 6-56 -2 in Blow-Off Install
APWA Standards
MODIFICATIONS TO APWA PLAN DETAILS. 11-15-2023
Plan Construction Notes
Plan Construction Notes 2-16-2024 (Must be included in For Construction Plans.)
General Notes for Plans
General Notes for Plans 2-8-2024 (Must be included in For Construction Plans.)